November 21 - 28:
Bottom row:
Little Sugar Bush Lake freezes over; site on November 22; more rafters coming in;
the huge crane for lifting those third floor rafters.
Middle row:
Site overview, November 23; third floor shaping up; anyone ready for the hot tub?
Top row:
Lifting and placing third floor rafters; pouring entryway columns.
|

|

|

|

|

|

|

|

|

|

|

|

|
November 14 - 17:
Bottom row:
Clearing snow from the site; starting the flooring for the third level;
a beautiful frost morning.
Middle row:
Site overview, Nov 15; the first rafters over the kitchen; third floor flooring
nearly wrapped up, along with kitchen rafters.
Top row:
Site overview, Nov 16; exteriors for the second level; ripping threw the frost line to lay utility lines;
hosting a Dr. Val Farmer group: a meal in the Cathouse.
|

|

|

|

|

|

|

|

|

|

|

|

|
November 6 - 10:
Bottom row:
White dusting; panels and rafters ready to go; main entrance framing.
Top row:
New forklift; interior and main entrance framing; trench for utility lines.
|

|

|

|

|

|

|

|

|
October 31 - November 3:
Bottom row:
Pulling "stones" to construct the main rock entry; lakeside view of the
new first floor framing.
Middle row:
Dining room, lounge, taking shape; south wall cut up; prepping for second story trusses.
Truckloads of trusses; unloading trusses; setting the truss foundation for the
large conference room.
Top row:
Site overview on Nov 2nd; installing trusses for second floor; view of the main
entry hallway; site overview on Nov 3rd.
|

|

|

|

|

|

|

|

|

|

|

|

|