Construction Photo Album

November 2000

Click on any image to see a larger version.


November 21 - 28:
Bottom row: Little Sugar Bush Lake freezes over; site on November 22; more rafters coming in; the huge crane for lifting those third floor rafters.
Middle row: Site overview, November 23; third floor shaping up; anyone ready for the hot tub?
Top row: Lifting and placing third floor rafters; pouring entryway columns.













November 14 - 17:
Bottom row: Clearing snow from the site; starting the flooring for the third level; a beautiful frost morning.
Middle row: Site overview, Nov 15; the first rafters over the kitchen; third floor flooring nearly wrapped up, along with kitchen rafters.
Top row: Site overview, Nov 16; exteriors for the second level; ripping threw the frost line to lay utility lines; hosting a Dr. Val Farmer group: a meal in the Cathouse.













November 6 - 10:
Bottom row: White dusting; panels and rafters ready to go; main entrance framing.
Top row: New forklift; interior and main entrance framing; trench for utility lines.









October 31 - November 3:
Bottom row: Pulling "stones" to construct the main rock entry; lakeside view of the new first floor framing.
Middle row: Dining room, lounge, taking shape; south wall cut up; prepping for second story trusses. Truckloads of trusses; unloading trusses; setting the truss foundation for the large conference room.
Top row: Site overview on Nov 2nd; installing trusses for second floor; view of the main entry hallway; site overview on Nov 3rd.