Construction Photo Album

May 2000

Click on any image to see a larger version.


May 22-24:
The new back bowl area; ladyslippers in full bloom; bearing wall footings poured; view of the site from the top of one of the cabins.





May 15-20:
Bottom row: Ed working the excavator; another find for the new lodge; prepping for the new drain line.
Top row: Laying the new drain line; Jori Lotvola; pouring fill for the north end of the large conference room.









May 12-13: Drier weather, pour the footings:
Bottom row: Some of the new stain glass finds (by the light of a new day); the hot tub footing; digging out for the west end footing; another shot of the hot tub area.
Top row: West side kitchen footing; some of the huge rocks uncovered; pouring fresh concrete, and then spreading it.









May 7-11: Wet weather, slow progress:
Bottom row: Setting up the footing molds; digging some of the footing trenches; Jim and Martin.
Top row: More new treasure; another discovery of old windows; Lucky guarding the stash; some of the new chairs for the lodge.









May 3-6: Here we go!
Bottom row: Setting up and pouring some of the initial footings.
Top row: Making improvements on Skater's Waltz and adding a back bowl area for sliding; Paul Ringdahl (architect) and Jay; Bob St. Claire (masonry).









April 29-May 2: Dry weather, lots of progress made!
Bottom row: Finishing the excavation, and moving out the old Russian bunkhouse.
Top row: Final clean up in preparation for placing the footings.