May 22-24:
The new back bowl area; ladyslippers in full bloom; bearing wall footings poured; view of the
site from the top of one of the cabins.
|

|

|

|

|
May 15-20:
Bottom row: Ed working the excavator; another find for the new lodge; prepping for the new drain line.
Top row: Laying the new drain line; Jori Lotvola; pouring fill for the north
end of the large conference room.
|

|

|

|

|

|

|

|

|
May 12-13:
Drier weather, pour the footings:
Bottom row: Some of the new stain glass finds (by the light of a new day);
the hot tub footing; digging out for the west end footing; another
shot of the hot tub area.
Top row: West side kitchen footing; some of the huge rocks uncovered;
pouring fresh concrete, and then spreading it.
|

|

|

|

|

|

|

|

|
May 7-11:
Wet weather, slow progress:
Bottom row: Setting up the footing molds; digging some of the footing trenches;
Jim and Martin.
Top row: More new treasure; another discovery of old windows; Lucky guarding the
stash; some of the new chairs for the lodge.
|

|

|

|

|

|

|

|

|
May 3-6:
Here we go!
Bottom row: Setting up and pouring some of the initial footings.
Top row: Making improvements on Skater's Waltz and adding a back bowl
area for sliding; Paul Ringdahl (architect) and Jay; Bob St. Claire (masonry).
|

|

|

|

|

|

|

|

|
April 29-May 2:
Dry weather, lots of progress made!
Bottom row: Finishing the excavation, and moving out the old Russian
bunkhouse.
Top row: Final clean up in preparation for placing the footings.
|

|

|

|

|

|

|

|

|