March 12-26:
Bottom row:
North tower cap goes on!
Top row:
West tower cap goes up; site overview with the new caps in place.
|

|

|

|

|

|

|

|

|
March 12-26:
Bottom row:
Hallway paneling; lots of doors needed; stairway work progressing; Charlie Beck's giant
stainglass donation now installed.
Top row:
Entrance for the kitchen staff; conference room entrance framing; entrance
framing near the hot tub.
|

|

|

|

|

|

|

|

|
March 6-8:
Bottom row:
Lower level moving along; massage rooms hallway; completing the roof
on the north tower cap.
Top row:
West tower cap almost ready; lakeside view looking good; hot tub area; main
floor lounge area coming along fast.
|

|

|

|

|

|

|

|

|
March 2-6:
Bottom row:
Framing up the north tower cap; work wrapping up on the steel roof; stairs
to the lower level; one of the conference rooms (sporting some neon clocks
for now).
Top row:
Kitchen serving area; library space on the upper level; window layout planning;
some the huge stainglass windows we had been waiting for.
|

|

|

|

|

|

|

|

|