December 31 - January 2:
Bottom row:
Cut the hole for the plunge; first plunger of the season!
Top row:
New Embassy look: lower level; Embassy: one of the three beds on the top side; shoveling
snow from the roof; laying tar paper.
|

|

|

|

|

|

|

|

|
December 21 - 31:
Bottom row:
Site overview, Dec 21; finish the roof line; windows ready; south
facing side (hot tub under the plastic tarps).
Top row:
Putting in the main level in-floor heating; kitchen wiring; windows
in the SW corner of the new dining hall; site overview, Dec 31.
|

|

|

|

|

|

|

|

|
December 1 - 11:
Bottom row:
Site from the lake, Dec 1; setting and pouring the north retaining wall;
laying tubes for in-floor heating in the hot tub area.
Middle row:
Boiler room - heating plant for the entire lodge; Eric mounting bindings;
remodeling in the Embassy cabin; lower level conference rooms.
Top row:
Site overview, Dec 6; pouring the floor for the hot tub area; site overview
Dec 11; installing thousands of clips for in-floor heat.
|

|

|

|

|

|

|

|

|

|

|

|

|