August 10-August 22:
Pouring the kitchen slab; setting the hot tub pad; site overview on August 22, waiting for
the framing to begin!
|

|

|

|

|
July 17-August 2:
Bottom row: Site overview on July 17; hot tub area taking shape in the upper left corner;
tubing layed out for locker/mech room; pouring the floor.
Middle row: Setting the elevator lift; pouring more flooring; graded kitchen area; kitchen
area tubing now prepped.
Top row: Pouring the last of the lower floor; new floor curing; another great find; Fred
working on roof improvements to the Great Northern.
|

|

|

|

|

|

|

|

|

|

|

|

|
July 12-July 14:
Bottom row: pouring the storage area floor.
Middle row: Watering the slab; heat tubing for the meeting rooms; the ditchwitch.
Top row: Pouring slab for hot tub area; lots of machinery; filling the kitchen area.
|

|

|

|

|

|

|

|

|

|

|

|

|
July 7-July 10:
Bottom row: site overview; unloading the kitchen sinks; pouring more concrete; Jake working the compactor.
Top row: laying the insulation; starting the heating tubes; heating field; Lucky inspecting the tubing.
|

|

|

|

|

|

|

|

|